Last edited by Shat
Sunday, April 19, 2020 | History

2 edition of Lab Bay project area draft environmental impact statement found in the catalog.

Lab Bay project area draft environmental impact statement

Ketchikan Pulp Company long-term timber sale contract

by United States. Forest Service.

  • 202 Want to read
  • 37 Currently reading

Published by U.S. Dept. of Agriculture, Forest Service, Alaska Region in [Juneau, Alaska?] .
Written in English

    Subjects:
  • Forest management,
  • Natural resources,
  • Timber

  • Edition Notes

    SeriesR10-MB -- 296a, R10-MB -- 296a.
    The Physical Object
    Pagination1 volume (various pagings) :
    ID Numbers
    Open LibraryOL25845444M
    OCLC/WorldCa894586776

    Noise Impact Assessment Na Pua Makani Wind Farm TABLE OF CONTENTS ENVIRONMENTAL NOISE DESCRIPTORS 1 LOW FREQUENCY NOISE AND INFRASOUND 4 U.S. ENVIRONMENTAL PROTECTION AGENCY 5 STATE OF HAWAII COMMUNITY NOISE REGULATIONS 5 LOW FREQUENCY NOISE AND INFRASOUND GUIDELINES 7 ANSI . Re: Draft Bay Delta Conservation Plan and associated Draft Environmental Impact Report/Environmental Impact Statement (BDCP Draft EIR/EIS) Dear Mr. Wulff: The Delta Caucus is comprised of the five Delta County Farm Bureau’s; Contra . Draft Environmental Impact Statement Waikapu Country Town Prepared for: Waikapu Properties, LLC Honoapiilani Highway Waikapu, Maui, Hawaii Contact: Mike Atherton Prepared by: Planning Consultants Hawaii, LLC Submitted Pursuant to Chapter Hawai’i Revised Statutes and Ti Hawai’i Administrative Rules.   Federal Register: Notice of Availability and Notice of Public Meeting for the Draft Environmental Impact Statement (DEIS) for the Green Bank Observatory, Green Bank, West Virginia Draft EIS. Draft Environmental Impact Statement; Appendices to Draft Environmental Impact Statement; Public Comment Meeting: NSF hosted a public meeting to address the DEIS. The .


Share this book
You might also like
Forest soils & treatment impacts

Forest soils & treatment impacts

Canadian Women

Canadian Women

kiss and other stories

kiss and other stories

Computerised analyses of estimating inaccuracy and tender variability

Computerised analyses of estimating inaccuracy and tender variability

Globe High School Math (Teachers Edition)

Globe High School Math (Teachers Edition)

Daniel Whitney.

Daniel Whitney.

Miss Pym disposes.

Miss Pym disposes.

The autumn of central Paris

The autumn of central Paris

Toll-free and tele-tax (non-toll-free) telephone numbers.

Toll-free and tele-tax (non-toll-free) telephone numbers.

Jinnah, Linlithgow, and the making of Pakistan

Jinnah, Linlithgow, and the making of Pakistan

Barber family

Barber family

Proceedings of the second U.S.-Polish Symposium, Coal Surface Mining and Power Production in the Face of Environmental Protection Requirements

Proceedings of the second U.S.-Polish Symposium, Coal Surface Mining and Power Production in the Face of Environmental Protection Requirements

Lab Bay project area draft environmental impact statement by United States. Forest Service. Download PDF EPUB FB2

Get this from a library. Lab Bay project area draft environmental impact statement: Ketchikan Pulp Company long-term timber sale contract. [United States. Forest Service.; Harza Northwest, Inc.].

Get this from a library. Lab Bay project area final environmental impact statement: Ketchikan Pulp Company long-term timber sale contract. [United States. Forest Service.; Harza Northwest, Inc.]. Draft Environmental Impact Report / Environmental Impact Statement for the Bay Delta Conservation Plan: Chapter 27 Figures Author California Department of Water Resources, U.S.

Bureau of Reclamation, U.S. Fish and Wildlife Service, and National Marine Fisheries Service. "De- tailed Information" shall Include a copy of the project application and the draft environmental Impact statement.

(2) Notification to the appropriate State and local agencies and to the ap- propriate State and metropolitan clear- inghouses. (3) Notification to Interested persons. (c) A written record of the hearing shall be made. 5 Impact Statement (EIS) for the Bay Delta Conservation Plan (BDCP or Plan), a habitat conservation 6 plan (HCP)/natural community conservation plan (NCCP).

The EIR/EIS has been prepared pursuant 7 to the California Environmental Quality Act (CEQA) (Public Resources Code Sections –. DRAFT Environmental Impact Statement (EIS) for San Francisco Bay Deep Water Dredged Material Disposal Site Designation December 38°N 37°30'N Transverse Mercator Projection Scale 0 5 10 15 20 °30'W °w xvEPA °30'w U.S.

Environmental Protection Agency Region IX, 75 Hawthorne Street, San Francisco, CA Bay Delta Conservation Plan and Draft Environmental Impact Report/Environmental Impact Statement Available for Public Comment C ONTACTS: R eclamation –Loui sMoo r,wmoo [email protected] NMFS – Jim Milbury,[email protected] FWS – Steve Martarano,[email protected] F.

deliveries, river flows, and related environmental conditions in the study area. S.3 Intended Use of Environmental Impact Statement 37 The purpose of an Environmental Impact Statement (EIS) is not to recommend approval or rejection of a project, but to provide information to aid the public.

ES-4 Draft – June The Draft EIR for Plan Bay Area is an assessment of the potential impacts of implementation of proposed Plan as a whole. Assumed transportation and development project impacts are not analyzed individually.

Individual projects are required to separately comply with CEQA and/or the National Environmental Policy Act (NEPA), as applicable.

As lead Federal Agency pursuant to the National Environmental Policy Act of U.S. DEPARTMENT OF THE AIR FORCE As a Cooperating Agency pursuant to 40 CFR §(a)(1) DRAFT ENVIRONMENTAL IMPACT STATEMENT PROPOSED AIRFIELD SAFETY ENHANCEMENT PROJECT Tucson International Airport Tucson, Pima County, Arizona Abstract.

On December 7,BOEM published a Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) for the Construction and Operations Plan (COP) submitted by Vineyard Wind.

As part of this process, BOEM held public hearings from February 11. Draft Environmental Impact Statement (DEIS). Berry proposes to drill as many as new wells within the Project Area, which represents a full development scenario. The Project Area includes approximat acres and is located 11 miles south of Duchesne, Utah, in Township 6 South, Ranges 4 and 5 West.

Attached is the draft environmental impact statement (draft EIS) for the Oroville Facilities, located on the Feather River in the foothills of the Sierra Nevada in Butte County, California.

This draft EIS documents the view of governmental agencies, non-governmental organizations. Project Water Year Bay-Delta Accord SWRCB Order Draft Environmental Impact Report / Environmental Impact Statement for the Bay Delta Conservation Plan: Chapter 5 Figures. 17 as joint Lead Agencies, published a Draft Environmental Impact Report/Environmental Impact 18 Statement (Draft EIR/EIS) on the proposed BDCP.

This document contained a total of 15 action 19 alternatives, including Alternative 4, which was identified as DWR’s preferred alternative. The The Federal Railroad Administration (FRA), in cooperation with the Federal Transit Administration (FTA) and in coordination with the Maryland Department of Transportation and the National Railroad Passenger Corporation (Amtrak), completed the Draft Environmental Impact Statement (DEIS) and Section 4(f) Evaluation for the B&P Tunnel Project.

Home» DOE Releases Draft Environmental Impact Statement for Cleanup of Area IV and the Northern Buffer Zone at Santa Susana Field Lab SIMI VALLEY, Calif. – Today, the U.S. Department of Energy (DOE) released the Draft Environmental Impact Statement (Draft EIS) for cleanup of Area IV and the Northern Buffer Zone of the Santa Susana Field Laboratory (SSFL) in.

DRAFT ENVIRONMENTAL IMPACT STATEMENT. FOR THE. LAKEVIEW AMPHITHEATER. Onondaga County, New York. Lead Agency: Onondaga County Montgomery Street. Room Court House. Syracuse, New York Draft Environmental Impact Statement R:\Projects\RMV\J\EIS\ Cultural-Novdoc Chapter Watershed Existing Conditions Cultural Resources and may participate.

Interested (federally recognized) Native American tribes, local governments, and other parties are provided the draft materials and are invited to be concurring.

public notice, information meetings, a draft and final environmental impact statement (EIS), a public-contested case hearing, and finally a decision by the commission (Minn.

Rules ). The primary purpose of this draft EIS is to summarize the potential impacts of the Project and help the commission make an informed decision on the best.

Abstract: This Draft Environmental Impact Statement (EIS) has been prepared to analyze and disclose the estimated environmental effects of implementation of the Breckenridge Ski Resort Peak 6 Project. Breckenridge Ski Resort is located on the White River National Forest in Summit County, CO andFile Size: 9MB.

The Association of Bay Area Governments (ABAG) and the Metropolitan Transportation Commission (MTC) today released for public review the Draft Environmental Impact Report (Draft EIR) for Plan Bay Areathe region’s long-range transportation and housing blueprint.

Following the preparation of an Environmental Impact Statement (EIS) indevelopment of MRM’s underground operation commenced inwith the first shipment of concentrate commencing in mid Phase 2 of the mining operations involved converting MRM to an open pit.

NOTES: 1 Data based upon annual water balances for years for the San Francisco Bay Hydrologic Region. 2 Dedicated (ordeveloped) water supply refers to water distributed among urban and agricultural uses, used for protecting and restoring the environment, orstorage in surface water and groundwater reserw)irs.

The purpose of these hearings is to receive public testimony on the Draft EIS. Authority: This Notice of Availability for a Draft Environmental Impact Statement is in compliance with the National Environmental Policy Act ofas amended (42 U.S.C. et seq.), and is published pursuant to 40 CFR and 43 CFR Dated: Aug Area Engineer for Federal Highway Administration Megan White Director of Environmental Services for Washington State Department of Transportation Grace Crunican Director of Seattle Department of Transportation for the City of Seattle Alaskan Way Viaduct & Seawall Replacement Project Draft Environmental Impact Statement Cover Sheet i Abstract.

The staff of the Federal Energy Regulatory Commission (Commission or FERC) has prepared a draft environmental impact statement (EIS) for the projects proposed by Mountain Valley Pipeline LLC (Mountain Valley) in Docket No.

CP and Equitrans LP (Equitrans) in. I Draft Environmental Impact Statement I ENVIRONMENTAL IMPACT STUDY SUMMARY Description of the Proposed Project I, the main north-south roadway through Oakland County, is experiencing congestion in the peak periods that will get more severe and extend through greater portions of the day as the future unfolds.

Central Arizona Project Allocation Administrative Draft Environmental Impact Statement Appendix A – Background Assumptions Table of Contents Page # I. INTRODUCTION A-1 II.

LIST OF KEY ASSUMPTIONS A-3 A. CAP Diversions and Available Colorado River Water A-3 B. Water Priorities A-4 C. Indian Development Schedule and Water Use A The SCWA, as the California Environmental Quality Act (CEQA) Lead Agency and the Bureau of Reclamation (Reclamation), as the Lead Agency under the National Environmental Policy Act (NEPA), completed a Draft EIR/EIS for Phase 1 of the North Bay Water Recycling Program Project (Phase 1 Project).

Draft Environmental Impact Statement Spruce Beetle Epidemic and Aspen Decline Management Response SUMMARY The Grand Mesa, Uncompahgre, and Gunnison National Forests (GMUG) propose to implement multiple vegetation management actions within the Spruce Beetle Epidemic and Aspen Decline Management Response (SBEADMR) project.

Draft Environmental Impact Statement Introduction March The elements of the proposed project include constructing additional process units in mostly developed areas within the refinery boundaries and road refinements on North Texas Road adjacent to the refinery to the south.

One of the planned areas within the refinery would require. This Draft Environmental Impact Statement (Draft EIS) analyzes the environmental impacts of fuel economy standards and reasonable alternative standards for model years passenger cars and light trucks (“light-duty vehicles”) that NHTSA has proposed under the Energy Policy and Conservation.

Draft Environmental Impact Statement. FERC Staff Issues the Draft Environmental Impact Statement for the Atlantic Coast Pipeline, LLC, Dominion Transmission, Inc. and Atlantic and Piedmont Natural Gas. Co., Inc. (CP, ; CP; and CP) Issued: Decem Hudson Tunnel Project. The Project is intended to preserve the current functionality of the Northeast Corridor’s (NEC) Hudson River rail crossing between New Jersey and New York and strengthen the resilience of the NEC.

The EIS is being prepared pursuant to the National Environmental Policy Act of (NEPA). As appropriate, FRA and NJ TRANSIT will coordinate with Amtrak and the Port.

Alaska LNG Project (CP) Jordan Cove Energy Project (CP and CP) Final Environmental Impact Statements. Southgate Project (CP) Magnolia Liquefied Natural Gas Production Capacity Amendment Project (CP) Environmental Assessments.

Lamar County Expansion Project (CP). Office of National Marine Sanctuaries. Mallows Bay- Potomac River National Marine Sanctuary Designation Draft Environmental Impact Statement. U.S. Department of Commerce, National Oceanic and Atmospheric Administration, Office of National Marine Sanctuaries, Silver Spring, MD.

COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating agency in the preparation of the Abengoa Biorefinery Project EIS.

TITLE: Draft Environmental Impact Statement for the Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas (DOE/EISD) (Abengoa Biorefinery Project. Draft Environmental Impact Report/Environmental Impact Statement. August Cover. Title Page Executive Summary.

Table of Contents. Acronyms and Abbreviations. Chapter 1: Introduction. Chapter 2: Alternatives Analysis. Chapter 3: Description of the Sites Reservoir Project Alternatives. Chapter 4: Environmental Compliance and Permit Summary. An outline of the geology of the area, focussing on the key issues listed in Sectionincluding: o A summary of the results of studies and surveys undertaken to identify the extent of the resource within the Project area; and.

Search Ecology Publications & Forms: Publications Home. This tool searches Ecology Publications only (it doesn’t search our webpages). Use any combination of the search criteria boxes below to narrow your results.

A maximum of results will display with the most recent publications at the top.Abstract: This draft environmental impact statement (DEIS) summarizes the analysis and potential effects of tree harvesting, thinning, prescribed burning and hazardous fuels reduction.

The project area occurs on the Swan Lake Ranger District, Flathead National Forest, and is within the Island Unit, an aggregation of National Forest System.C.

Project Team This Environmental Impact Statement (EIS) has been prepared by a co-ordinated team of environmental professionals, including McArthur River Mining Pty. Ltd. technical personnel and a team of technical specialist consultants.

The environmental studies and this EIS have been coordinated and compiled by Mining and Energy.